WeldGuard

Disputed calls

When a contractor challenges an inspection call, it is escalated to a senior reviewer — NDT Level III, Senior CWI, or Coating Level 3. An overturned call rewrites the joint record and clears any welder charge that came with it.

Escalations raised

9

Awaiting review

4

Determinations

5

Overturn rate

40%

  • J-4381Visual (CWI)RepairCall overturned8/1/2026

    Undercut call challenged — depth gauged at less than 1/32 in and not continuous. Escalating to Senior CWI.

    Raised by Kyle Bassett (Contractor QC) · original call by Joanne Reyes

    Escalated to Senior CWI · Alicia Brenner (Senior CWI / SCWI)

    Senior CWI re-inspected in the ditch. Undercut 0.020 in, non-continuous — acceptable per API 1104 9.3.9. Charge to welder removed.

    Revised call: Repair Accept

  • J-4333Visual (CWI)RepairCall upheld7/31/2026

    Undercut call challenged — depth gauged at less than 1/32 in and not continuous. Escalating to Senior CWI.

    Raised by Kyle Bassett (Contractor QC) · original call by Travis Kellerman

    Escalated to Senior CWI · Alicia Brenner (Senior CWI / SCWI)

    Re-inspection confirms high-low beyond allowable misalignment. Repair call stands.

  • J-4269Visual (CWI)RepairOpen7/30/2026

    Undercut call challenged — depth gauged at less than 1/32 in and not continuous. Escalating to Senior CWI.

    Raised by Kyle Bassett (Contractor QC) · original call by Joanne Reyes

    Escalated to Senior CWI · Alicia Brenner (Senior CWI / SCWI)

  • J-4160Radiographic (NDT)RepairCall overturned7/28/2026

    Crew disputes the low cap call — cap reinforcement measured within API 1104 limits on the ditch side. Requesting Level III film review.

    Raised by Kyle Bassett (Contractor QC) · original call by Dana Halloran

    Escalated to NDT Level III · Curtis Vandergriff (NDT Level III (RT/UT))

    Level III re-read of the film: cap reinforcement 1/16 in, within API 1104 5.3.3. Original repair call not supported — joint released as accepted.

    Revised call: Repair Accept

  • J-4120Radiographic (NDT)RepairCall upheld7/28/2026

    Crew disputes the low cap call — cap reinforcement measured within API 1104 limits on the ditch side. Requesting Level III film review.

    Raised by Kyle Bassett (Contractor QC) · original call by Dana Halloran

    Escalated to NDT Level III · Curtis Vandergriff (NDT Level III (RT/UT))

    Level III concurs with the original interpretation. Slag inclusion length exceeds allowable; repair stands.

  • J-4080Radiographic (NDT)RepairUnder review7/27/2026

    Crew disputes the low cap call — cap reinforcement measured within API 1104 limits on the ditch side. Requesting Level III film review.

    Raised by Kyle Bassett (Contractor QC) · original call by Dana Halloran

    Escalated to NDT Level III · Curtis Vandergriff (NDT Level III (RT/UT))

  • J-4040Radiographic (NDT)RepairOpen7/26/2026

    Crew disputes the low cap call — cap reinforcement measured within API 1104 limits on the ditch side. Requesting Level III film review.

    Raised by Kyle Bassett (Contractor QC) · original call by Dana Halloran

    Escalated to NDT Level III · Curtis Vandergriff (NDT Level III (RT/UT))

  • J-0884CoatingRejectCall upheld5/22/2026

    DFT readings disputed — gauge calibration questioned, crew re-shot readings within spec range. Escalating to Level 3 coating inspector.

    Raised by Dell Ramirez (Coating Sub Foreman) · original call by Renee Alcorta

    Escalated to Coating Level 3 · Rudy Tolentino (Coating Inspector Level 3)

    Level 3 witnessed re-shoot with calibrated gauge. Low DFT confirmed on the 6 o'clock quadrant; recoat required.

  • J-0900CoatingRejectOpen5/22/2026

    DFT readings disputed — gauge calibration questioned, crew re-shot readings within spec range. Escalating to Level 3 coating inspector.

    Raised by Dell Ramirez (Coating Sub Foreman) · original call by Renee Alcorta