Basin Midstream Operating
Permian Gateway Loop 12
Redrock Pipeline Services · Line LN-12 · 24" OD
All destinations
Joints
4,400
≈ 50 mi of 60-ft joints
Inspected
4,172/4,400
228 awaiting NDT
Repair rate
2.5%
104 repair · 2 reject
Visual (CWI)
99%
59 joints without a final visual
Open alerts
64
Survey vs NDT mismatches
Pipe spec & approved procedures
- Diameter
- 24" OD
- Wall thickness
- 0.375–0.375 in
- Material
- API 5L X65, ASTM A106 Gr. B
- Weld procedures
- WPS-1104-AG-07, WPS-1104-DH-01, WPS-1104-TI-11
- Positions
- 5G / 6G, 6G (fixed)
- Hardness limit
- 235 HV10 max, 248 HV10 max
Welder qualification mismatches
CrewEvery active welder holds a procedure covering this job's pipe spec.
Open cross-check alerts
View allJ-2500 · NDT shot before visual inspection
Radiography was shot before the CWI visual inspection was completed - inspection sequence out of order.
J-3802 · No CWI visual inspection recorded
Cap pass complete but no CWI visual inspection is on record - API 1104 requires a visual on every weld.
J-3904 · No CWI visual inspection recorded
Cap pass complete but no CWI visual inspection is on record - API 1104 requires a visual on every weld.
J-3747 · No CWI visual inspection recorded
Cap pass complete but no CWI visual inspection is on record - API 1104 requires a visual on every weld.
J-1891 · No CWI visual inspection recorded
Cap pass complete but no CWI visual inspection is on record - API 1104 requires a visual on every weld.
Crew repair rate
All welders- RC-455Jesse Karr744 joints5.8%
- RC-533Dale Whitcomb1094 joints3.5%
- RC-412Andre Pickett1144 joints3.3%
- RC-158Junior Escamilla993 joints3.2%
- RC-118Marcus Cole1260 joints3.0%
- RC-547Ronnie Pace703 joints2.9%
- RC-146Bo Kinchen966 joints2.8%
- RC-540Brent Kessler1216 joints2.8%
- RC-165Cody Latham695 joints2.7%
- RC-204Dwayne Ferris2585 joints2.6%
Recent joints
All jointsaccepted Pilot mode — no login required. Switch roles from the header to see each crew view.