J-4120
repairRepair- Line
- LN-12
- Station
- 2472+00
- Weld date
- 2026-06-15
- Spec
- 24" × 0.375"
34.31320, -104.65720
No open cross-check alerts on this joint.
Welder passes
- RootWorking sideMarcus Cole RC-118
Jun 15, 2026, 8:35 AM · logged by C. Ramirez (Survey)
WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G
6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max
- RootDitch sideOdell Rains RC-121
Jun 15, 2026, 8:35 AM · logged by C. Ramirez (Survey)
WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G
6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max
- Hot PassWorking sideBo Kinchen RC-146
Jun 15, 2026, 9:10 AM · logged by C. Ramirez (Survey)
WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G
6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max
- Hot PassDitch sideTy Maldonado RC-552
Jun 15, 2026, 9:10 AM · logged by C. Ramirez (Survey)
WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4
4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max
- FillWorking sideMarvin Doucet RC-173
Jun 15, 2026, 9:45 AM · logged by C. Ramirez (Survey)
WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G
6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max
- FillDitch sideSam Whitfield RC-388
Jun 15, 2026, 9:45 AM · logged by C. Ramirez (Survey)
WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4
4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max
- CapDitch sideJesse Karr RC-455
Jun 15, 2026, 10:20 AM · logged by C. Ramirez (Survey)
WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G
6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max
- CapWorking sideKelly Boudreaux RC-350
Jun 15, 2026, 10:20 AM · logged by C. Ramirez (Survey)
WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4
4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max
- RepairWorking sideJesse Karr RC-455
Jun 15, 2026, 10:30 AM · logged by C. Ramirez (Survey)
WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G
6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max
NDT results
- RTRepair
Jun 15, 2026, 8:00 PM · D. Halloran (ASNT II)
Moisture / weather-related porosity (not charged to welder)
Not charged to a welder.
Repairable indication — grind and re-weld authorized.
RT film map — clock position3 indications12123456789101112- PORPorosity12:50–12:56 · 0.59" · d 0.03"Within acceptance limits.
- SISlag inclusion5:14–5:28 · 1.39" · d 0.07"SI exceeds API 1104 acceptance limits — charged for re-work.
- PORPorosity8:11–8:16 · 0.46" · d 0.03"Within acceptance limits.
Call disputedCall upheld7/28/2026Kyle Bassett (Contractor QC) — Crew disputes the low cap call — cap reinforcement measured within API 1104 limits on the ditch side. Requesting Level III film review.
Escalated to NDT Level III · Curtis Vandergriff (NDT Level III (RT/UT))
Level III concurs with the original interpretation. Slag inclusion length exceeds allowable; repair stands.
Visual inspection (CWI)
API 1104
Coating inspection
No coating inspection recorded for this joint.