WeldGuard
All joints

J-4175

weldedNot inspected
Line
LN-12
Station
2505+00
Weld date
2026-06-15
Spec
24" × 0.375"

34.34675, -104.68800

No open cross-check alerts on this joint.

Welder passes

  1. RootWorking side
    Weston Trahan RC-133

    Jun 15, 2026, 8:35 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  2. RootDitch side
    Weston Trahan RC-133

    Jun 15, 2026, 8:35 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  3. Hot PassDitch side
    Travis Nolan RC-307

    Jun 15, 2026, 9:10 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  4. Hot PassWorking side
    Ty Maldonado RC-552

    Jun 15, 2026, 9:10 AM · logged by C. Ramirez (Survey)

    WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4

    4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max

  5. FillDitch side
    Jesse Karr RC-455

    Jun 15, 2026, 9:45 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  6. FillWorking side
    Cody Latham RC-165

    Jun 15, 2026, 9:45 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  7. CapWorking side
    Sam Whitfield RC-388

    Jun 15, 2026, 10:20 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  8. CapDitch side
    Kelly Boudreaux RC-350

    Jun 15, 2026, 10:20 AM · logged by C. Ramirez (Survey)

    WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4

    4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max

NDT results

No inspection recorded yet.

Visual inspection (CWI)

  • Fit-upAcceptTravis KellermanJun 15, 2026, 6:00 AM

    API 1104 · Bevel, alignment and hi-lo verified prior to root.

  • Root beadAcceptTravis KellermanJun 15, 2026, 7:30 AM

    API 1104 · Root bead visual prior to hot pass.

  • Final visualAcceptTravis KellermanJun 15, 2026, 11:15 AM

    API 1104

Coating inspection

No coating inspection recorded for this joint.