WeldGuard
All joints

J-4167

acceptedAccept
Line
LN-12
Station
2500+20
Weld date
2026-06-15
Spec
24" × 0.375"

34.34187, -104.68352

No open cross-check alerts on this joint.

Welder passes

  1. RootDitch side
    Brent Kessler RC-540

    Jun 15, 2026, 8:35 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  2. RootWorking side
    Marcus Cole RC-118

    Jun 15, 2026, 8:35 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  3. Hot PassWorking side
    Bo Kinchen RC-146

    Jun 15, 2026, 9:10 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  4. Hot PassDitch side
    Ty Maldonado RC-552

    Jun 15, 2026, 9:10 AM · logged by C. Ramirez (Survey)

    WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4

    4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max

  5. FillWorking side
    Cody Latham RC-165

    Jun 15, 2026, 9:45 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  6. FillDitch side
    Jesse Karr RC-455

    Jun 15, 2026, 9:45 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  7. CapDitch side
    Shane Bergeron RC-181

    Jun 15, 2026, 10:20 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  8. CapWorking side
    Kelly Boudreaux RC-350

    Jun 15, 2026, 10:20 AM · logged by C. Ramirez (Survey)

    WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4

    4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max

NDT results

  • RTAccept

    Jun 15, 2026, 8:00 PM · P. Estrada (ASNT II)

    No recordable indications.

    RT film map — clock position2 indications
    12123456789101112
    • PORPorosity1:321:35 · 0.35" · d 0.09"Minor indication, within acceptance limits.
    • PORPorosity7:387:40 · 0.19" · d 0.05"Minor indication, within acceptance limits.

Visual inspection (CWI)

  • Fit-upAcceptJoanne ReyesJun 15, 2026, 6:00 AM

    API 1104 · Bevel, alignment and hi-lo verified prior to root.

  • Root beadAcceptJoanne ReyesJun 15, 2026, 7:30 AM

    API 1104 · Root bead visual prior to hot pass.

  • Final visualAcceptJoanne ReyesJun 15, 2026, 1:11 PM

    API 1104

Coating inspection

No coating inspection recorded for this joint.