J-0062
acceptedAccept- Line
- LN-12
- Station
- 37+20
- Weld date
- 2026-05-04
- Spec
- 24" × 0.375"
31.83782, -102.38472
No open cross-check alerts on this joint.
Welder passes
- RootWorking sideRay Delgado RC-501
May 4, 2026, 8:35 AM · logged by C. Ramirez (Survey)
WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4
4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max
- RootDitch sideCurtis Vann RC-514
May 4, 2026, 8:35 AM · logged by C. Ramirez (Survey)
WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4
4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max
- Hot PassWorking sideCurtis Vann RC-514
May 4, 2026, 9:10 AM · logged by C. Ramirez (Survey)
WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4
4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max
- Hot PassDitch sideRay Delgado RC-501
May 4, 2026, 9:10 AM · logged by C. Ramirez (Survey)
WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4
4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max
- FillDitch sideCurtis Vann RC-514
May 4, 2026, 9:45 AM · logged by C. Ramirez (Survey)
WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4
4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max
- FillWorking sideRay Delgado RC-501
May 4, 2026, 9:45 AM · logged by C. Ramirez (Survey)
WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4
4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max
- CapWorking sideCurtis Vann RC-514
May 4, 2026, 10:20 AM · logged by C. Ramirez (Survey)
WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4
4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max
- CapDitch sideRay Delgado RC-501
May 4, 2026, 10:20 AM · logged by C. Ramirez (Survey)
WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4
4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max
NDT results
- RTAccept
May 4, 2026, 8:00 PM · D. Halloran (ASNT II)
No recordable indications.
RT film map — clock position2 indications12123456789101112- EUExcess reinforcement1:34–1:35 · 0.17" · d 0.04"Minor indication, within acceptance limits.
- LCLow cap8:11–8:13 · 0.22" · d 0.06"Call varies by inspectorMinor indication, within acceptance limits.
Visual inspection (CWI)
API 1104
Coating inspection
- DFT
- 26 mils
- Holidays
- 0
- Surface temp
- 93°F
- Humidity
- 38%
SSPC-SP 10 near-white blast · FBE + ARO overlay