WeldGuard
All joints

J-4060

acceptedAccept
Line
LN-12
Station
2436+00
Weld date
2026-06-14
Spec
24" × 0.375"

34.27660, -104.62360

No open cross-check alerts on this joint.

Welder passes

  1. RootDitch side
    Brent Kessler RC-540

    Jun 14, 2026, 8:35 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  2. RootWorking side
    Weston Trahan RC-133

    Jun 14, 2026, 8:35 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  3. Hot PassDitch side
    Travis Nolan RC-307

    Jun 14, 2026, 9:10 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  4. Hot PassWorking side
    Ty Maldonado RC-552

    Jun 14, 2026, 9:10 AM · logged by C. Ramirez (Survey)

    WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4

    4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max

  5. FillDitch side
    Sam Whitfield RC-388

    Jun 14, 2026, 9:45 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  6. FillWorking side
    Sam Whitfield RC-388

    Jun 14, 2026, 9:45 AM · logged by C. Ramirez (Survey)

    WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4

    4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max

  7. CapDitch side
    Sam Whitfield RC-388

    Jun 14, 2026, 10:20 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  8. CapWorking side
    Shane Bergeron RC-181

    Jun 14, 2026, 10:20 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

NDT results

  • RTAccept

    Jun 14, 2026, 8:00 PM · D. Halloran (ASNT II)

    No recordable indications.

    RT film map — clock position1 indication
    12123456789101112
    • LCLow cap11:5412:01 · 0.74" · d 0.07"Call varies by inspectorCap reinforcement below flush — called for grind-out and cap re-run.

Visual inspection (CWI)

  • Fit-upAcceptTravis KellermanJun 14, 2026, 6:00 AM

    API 1104 · Bevel, alignment and hi-lo verified prior to root.

  • Final visualAcceptTravis KellermanJun 14, 2026, 10:12 AM

    API 1104

Coating inspection

No coating inspection recorded for this joint.