J-0034

acceptedAccept
Line
LN-12
Station
20+40
Weld date
2026-05-04
Spec
24" × 0.375"

31.82074, -102.36904

No open cross-check alerts on this joint.

Welder passes

  1. RootWorking side
    Marcus Cole RC-118

    May 4, 2026, 8:35 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  2. RootDitch side
    Dwayne Ferris RC-204

    May 4, 2026, 8:35 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  3. Hot PassWorking side
    Ty Maldonado RC-552

    May 4, 2026, 9:10 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  4. Hot PassDitch side
    Luis Ontiveros RC-231

    May 4, 2026, 9:10 AM · logged by C. Ramirez (Survey)

    WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4

    4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max

  5. FillDitch side
    Shane Bergeron RC-181

    May 4, 2026, 9:45 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  6. FillWorking side
    Andre Pickett RC-412

    May 4, 2026, 9:45 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  7. CapWorking side
    Jesse Karr RC-455

    May 4, 2026, 10:20 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  8. CapDitch side
    Kelly Boudreaux RC-350

    May 4, 2026, 10:20 AM · logged by C. Ramirez (Survey)

    WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4

    4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max

NDT results

  • RTAccept

    May 4, 2026, 8:00 PM · D. Halloran (ASNT II)

    No recordable indications.

    RT film map — clock position1 indication
    12123456789101112
    • LCLow cap9:269:34 · 0.83" · d 0.06"Call varies by inspectorCap reinforcement below flush — called for grind-out and cap re-run.

Visual inspection (CWI)

  • Fit-upAcceptHector SalasMay 4, 2026, 6:00 AM

    API 1104 · Bevel, alignment and hi-lo verified prior to root.

  • Final visualAcceptHector SalasMay 4, 2026, 10:45 AM

    API 1104

Coating inspection

  • AcceptRenee Alcorta5/4/2026
    DFT
    21.5 mils
    Holidays
    0
    Surface temp
    78°F
    Humidity
    53%

    SSPC-SP 10 near-white blast · FBE + ARO overlay