J-0080
repairRepair- Line
- LN-12
- Station
- 48+00
- Weld date
- 2026-05-04
- Spec
- 24" × 0.375"
31.84880, -102.39480
No open cross-check alerts on this joint.
Welder passes
- RootDitch sideOdell Rains RC-121
May 4, 2026, 8:35 AM · logged by C. Ramirez (Survey)
WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G
6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max
- RootWorking sideDwayne Ferris RC-204
May 4, 2026, 8:35 AM · logged by C. Ramirez (Survey)
WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G
6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max
- Hot PassWorking sideTravis Nolan RC-307
May 4, 2026, 9:10 AM · logged by C. Ramirez (Survey)
WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G
6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max
- Hot PassDitch sideLuis Ontiveros RC-231
May 4, 2026, 9:10 AM · logged by C. Ramirez (Survey)
WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4
4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max
- FillWorking sideAndre Pickett RC-412
May 4, 2026, 9:45 AM · logged by C. Ramirez (Survey)
WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G
6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max
- FillDitch sideKelly Boudreaux RC-350
May 4, 2026, 9:45 AM · logged by C. Ramirez (Survey)
WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4
4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max
- CapDitch sideShane Bergeron RC-181
May 4, 2026, 10:20 AM · logged by C. Ramirez (Survey)
WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G
6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max
- CapWorking sideKelly Boudreaux RC-350
May 4, 2026, 10:20 AM · logged by C. Ramirez (Survey)
WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4
4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max
- RepairWorking sideJesse Karr RC-455
May 4, 2026, 10:30 AM · logged by C. Ramirez (Survey)
WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G
6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max
NDT results
- RTRepair
May 4, 2026, 8:00 PM · D. Halloran (ASNT II)
Fill pass — incomplete fusion charged to the fill welder
Charged to Andre Pickett (RC-412) — counts as a strike under the 3-repair rule.
Repairable indication — grind and re-weld authorized.
RT film map — clock position3 indications12123456789101112- IFIncomplete fusion12:07–12:22 · 1.63" · d 0.03"IF exceeds API 1104 acceptance limits — charged for re-work.
- PORPorosity12:43–12:48 · 0.55" · d 0.03"Within acceptance limits.
- LCLow cap1:07–1:11 · 0.46" · d 0.03"Call varies by inspectorWithin acceptance limits.
Visual inspection (CWI)
API 1104
Coating inspection
- DFT
- 20.2 mils
- Holidays
- 0
- Surface temp
- 75°F
- Humidity
- 60%
SSPC-SP 10 near-white blast · FBE + ARO overlay