WeldGuard
All joints

J-2920

repairRepair
Line
LN-12
Station
1752+00
Weld date
2026-06-02
Spec
24" × 0.375"

33.58120, -103.98520

No open cross-check alerts on this joint.

Welder passes

  1. RootDitch side
    Ray Delgado RC-501

    Jun 2, 2026, 8:35 AM · logged by C. Ramirez (Survey)

    WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4

    4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max

  2. RootWorking side
    Curtis Vann RC-514

    Jun 2, 2026, 8:35 AM · logged by C. Ramirez (Survey)

    WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4

    4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max

  3. Hot PassWorking side
    Ray Delgado RC-501

    Jun 2, 2026, 9:10 AM · logged by C. Ramirez (Survey)

    WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4

    4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max

  4. Hot PassDitch side
    Curtis Vann RC-514

    Jun 2, 2026, 9:10 AM · logged by C. Ramirez (Survey)

    WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4

    4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max

  5. FillDitch side
    Ray Delgado RC-501

    Jun 2, 2026, 9:45 AM · logged by C. Ramirez (Survey)

    WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4

    4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max

  6. FillWorking side
    Curtis Vann RC-514

    Jun 2, 2026, 9:45 AM · logged by C. Ramirez (Survey)

    WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4

    4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max

  7. CapWorking side
    Ray Delgado RC-501

    Jun 2, 2026, 10:20 AM · logged by C. Ramirez (Survey)

    WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4

    4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max

  8. CapDitch side
    Curtis Vann RC-514

    Jun 2, 2026, 10:20 AM · logged by C. Ramirez (Survey)

    WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4

    4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max

  9. RepairWorking side
    Curtis Vann RC-514

    Jun 2, 2026, 10:30 AM · logged by C. Ramirez (Survey)

    WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4

    4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max

NDT results

  • RTRepair

    Jun 2, 2026, 8:00 PM · D. Halloran (ASNT II)

    Material lamination in pipe body (mill defect, not charged)

    Not charged to a welder.

    Repairable indication — grind and re-weld authorized.

    RT film map — clock position3 indications
    12123456789101112
    • SISlag inclusion7:317:54 · 2.39" · d 0.07"SI exceeds API 1104 acceptance limits — charged for re-work.
    • LCLow cap7:467:50 · 0.42" · d 0.07"Call varies by inspectorWithin acceptance limits.
    • UCUndercut10:2510:26 · 0.13" · d 0.06"Within acceptance limits.

Visual inspection (CWI)

  • Root beadAcceptHector SalasJun 2, 2026, 7:30 AM

    API 1104 · Root bead visual prior to hot pass.

  • Final visualAcceptHector SalasJun 2, 2026, 1:48 PM

    API 1104

Coating inspection

No coating inspection recorded for this joint.