WeldGuard
All joints

J-0090

acceptedAccept
Line
LN-12
Station
54+00
Weld date
2026-05-04
Spec
24" × 0.375"

31.85490, -102.40040

No open cross-check alerts on this joint.

Welder passes

  1. RootWorking side
    Weston Trahan RC-133

    May 4, 2026, 8:35 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  2. RootDitch side
    Dwayne Ferris RC-204

    May 4, 2026, 8:35 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  3. Hot PassWorking side
    Travis Nolan RC-307

    May 4, 2026, 9:10 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  4. Hot PassDitch side
    Luis Ontiveros RC-231

    May 4, 2026, 9:10 AM · logged by C. Ramirez (Survey)

    WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4

    4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max

  5. FillWorking side
    Andre Pickett RC-412

    May 4, 2026, 9:45 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  6. FillDitch side
    Kelly Boudreaux RC-350

    May 4, 2026, 9:45 AM · logged by C. Ramirez (Survey)

    WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4

    4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max

  7. CapDitch side
    Kelly Boudreaux RC-350

    May 4, 2026, 10:20 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  8. CapWorking side
    Sam Whitfield RC-388

    May 4, 2026, 10:20 AM · logged by C. Ramirez (Survey)

    WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4

    4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max

NDT results

  • RTAccept

    May 4, 2026, 8:00 PM · D. Halloran (ASNT II)

    No recordable indications.

    RT film map — clock position1 indication
    12123456789101112
    • EUExcess reinforcement3:293:31 · 0.21" · d 0.08"Minor indication, within acceptance limits.

Visual inspection (CWI)

  • Fit-upAcceptJoanne ReyesMay 4, 2026, 6:00 AM

    API 1104 · Bevel, alignment and hi-lo verified prior to root.

  • Root beadAcceptJoanne ReyesMay 4, 2026, 7:30 AM

    API 1104 · Root bead visual prior to hot pass.

  • Final visualAcceptJoanne ReyesMay 4, 2026, 1:37 PM

    API 1104

Coating inspection

  • AcceptRenee Alcorta5/4/2026
    DFT
    22.4 mils
    Holidays
    0
    Surface temp
    78°F
    Humidity
    66%

    SSPC-SP 10 near-white blast · FBE + ARO overlay