J-2701

acceptedAccept
Line
LN-12
Station
1620+60
Weld date
2026-05-31
Spec
24" × 0.375"

33.44761, -103.86256

No open cross-check alerts on this joint.

Welder passes

  1. RootWorking side
    Brent Kessler RC-540

    May 31, 2026, 8:35 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  2. RootDitch side
    Dwayne Ferris RC-204

    May 31, 2026, 8:35 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  3. Hot PassWorking side
    Travis Nolan RC-307

    May 31, 2026, 9:10 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  4. Hot PassDitch side
    Hector Ruiz RC-528

    May 31, 2026, 9:10 AM · logged by C. Ramirez (Survey)

    WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4

    4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max

  5. FillWorking side
    Kelly Boudreaux RC-350

    May 31, 2026, 9:45 AM · logged by C. Ramirez (Survey)

    WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4

    4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max

  6. FillDitch side
    Sam Whitfield RC-388

    May 31, 2026, 9:45 AM · logged by C. Ramirez (Survey)

    WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4

    4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max

  7. CapDitch side
    Marvin Doucet RC-173

    May 31, 2026, 10:20 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  8. CapWorking side
    Kelly Boudreaux RC-350

    May 31, 2026, 10:20 AM · logged by C. Ramirez (Survey)

    WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4

    4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max

NDT results

  • RTAccept

    May 31, 2026, 8:00 PM · P. Estrada (ASNT II)

    No recordable indications.

    RT film map — clock position0 indications
    Clean film — no recordable indications
    12123456789101112

Visual inspection (CWI)

  • Final visualAcceptTravis KellermanMay 31, 2026, 1:47 PM

    API 1104

Coating inspection

No coating inspection recorded for this joint.