WeldGuard
All joints

J-0898

acceptedAccept
Line
LN-12
Station
538+80
Weld date
2026-05-13
Spec
24" × 0.375"

32.34778, -102.85288

Cross-check alerts

  • No CWI visual inspection recorded

    Cap pass complete but no CWI visual inspection is on record - API 1104 requires a visual on every weld.

Welder passes

  1. RootDitch side
    Odell Rains RC-121

    May 13, 2026, 8:35 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  2. RootWorking side
    Dwayne Ferris RC-204

    May 13, 2026, 8:35 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  3. Hot PassDitch side
    Junior Escamilla RC-158

    May 13, 2026, 9:10 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  4. Hot PassWorking side
    Luis Ontiveros RC-231

    May 13, 2026, 9:10 AM · logged by C. Ramirez (Survey)

    WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4

    4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max

  5. FillWorking side
    Shane Bergeron RC-181

    May 13, 2026, 9:45 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  6. FillDitch side
    Andre Pickett RC-412

    May 13, 2026, 9:45 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  7. CapDitch side
    Cody Latham RC-165

    May 13, 2026, 10:20 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  8. CapWorking side
    Sam Whitfield RC-388

    May 13, 2026, 10:20 AM · logged by C. Ramirez (Survey)

    WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4

    4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max

NDT results

  • RTAccept

    May 13, 2026, 8:00 PM · D. Halloran (ASNT II)

    No recordable indications.

    RT film map — clock position1 indication
    12123456789101112
    • LCLow cap10:0610:12 · 0.66" · d 0.02"Call varies by inspectorCap reinforcement below flush — called for grind-out and cap re-run.

Visual inspection (CWI)

No visual inspection recorded for this joint.

No final visual on record — API 1104 requires a visual inspection on every weld.

Coating inspection

  • RepairRenee Alcorta5/13/2026
    DFT
    21.3 mils
    Holidays
    0
    Surface temp
    91°F
    Humidity
    29%

    SSPC-SP 10 near-white blast · FBE + ARO overlay