J-0164
acceptedAccept- Line
- LN-12
- Station
- 98+40
- Weld date
- 2026-05-05
- Spec
- 24" × 0.375"
31.90004, -102.44184
No open cross-check alerts on this joint.
Welder passes
- RootDitch sideRay Delgado RC-501
May 5, 2026, 8:35 AM · logged by C. Ramirez (Survey)
WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4
4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max
- RootWorking sideCurtis Vann RC-514
May 5, 2026, 8:35 AM · logged by C. Ramirez (Survey)
WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4
4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max
- Hot PassWorking sideRay Delgado RC-501
May 5, 2026, 9:10 AM · logged by C. Ramirez (Survey)
WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4
4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max
- Hot PassDitch sideCurtis Vann RC-514
May 5, 2026, 9:10 AM · logged by C. Ramirez (Survey)
WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4
4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max
- FillDitch sideRay Delgado RC-501
May 5, 2026, 9:45 AM · logged by C. Ramirez (Survey)
WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4
4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max
- FillWorking sideCurtis Vann RC-514
May 5, 2026, 9:45 AM · logged by C. Ramirez (Survey)
WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4
4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max
- CapWorking sideRay Delgado RC-501
May 5, 2026, 10:20 AM · logged by C. Ramirez (Survey)
WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4
4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max
- CapDitch sideCurtis Vann RC-514
May 5, 2026, 10:20 AM · logged by C. Ramirez (Survey)
WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4
4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max
NDT results
- RTAccept
May 5, 2026, 8:00 PM · D. Halloran (ASNT II)
No recordable indications.
RT film map — clock position1 indication12123456789101112- PORPorosity7:28–7:32 · 0.49" · d 0.09"Minor indication, within acceptance limits.
Visual inspection (CWI)
API 1104 · Root bead visual prior to hot pass.
API 1104
Coating inspection
- DFT
- 25.5 mils
- Holidays
- 0
- Surface temp
- 75°F
- Humidity
- 29%
SSPC-SP 10 near-white blast · FBE + ARO overlay