WeldGuard
All joints

J-0200

repairRepair
Line
LN-12
Station
120+00
Weld date
2026-05-06
Spec
24" × 0.375"

31.92200, -102.46200

No open cross-check alerts on this joint.

Welder passes

  1. RootWorking side
    Weston Trahan RC-133

    May 6, 2026, 8:35 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  2. RootDitch side
    Dwayne Ferris RC-204

    May 6, 2026, 8:35 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  3. Hot PassWorking side
    Bo Kinchen RC-146

    May 6, 2026, 9:10 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  4. Hot PassDitch side
    Luis Ontiveros RC-231

    May 6, 2026, 9:10 AM · logged by C. Ramirez (Survey)

    WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4

    4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max

  5. FillDitch side
    Shane Bergeron RC-181

    May 6, 2026, 9:45 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  6. FillWorking side
    Kelly Boudreaux RC-350

    May 6, 2026, 9:45 AM · logged by C. Ramirez (Survey)

    WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4

    4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max

  7. CapDitch side
    Andre Pickett RC-412

    May 6, 2026, 10:20 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

  8. CapWorking side
    Kelly Boudreaux RC-350

    May 6, 2026, 10:20 AM · logged by C. Ramirez (Survey)

    WPS-1104-TI-11 Rev 1SMAW uphill 6G (fixed)E6010 / E7018-H4

    4–36 in OD · wall 0.188–0.75 in · hardness 235 HV10 max

  9. RepairWorking side
    Andre Pickett RC-412

    May 6, 2026, 10:30 AM · logged by C. Ramirez (Survey)

    WPS-1104-DH-01 Rev 2SMAW downhill 5G / 6GE6010 / E8010-G

    6–36 in OD · wall 0.188–0.75 in · hardness 248 HV10 max

NDT results

  • RTRepair

    May 6, 2026, 8:00 PM · D. Halloran (ASNT II)

    Moisture / weather-related porosity (not charged to welder)

    Not charged to a welder.

    Repairable indication — grind and re-weld authorized.

    RT film map — clock position1 indication
    12123456789101112
    • SISlag inclusion4:134:35 · 2.29" · d 0.08"SI exceeds API 1104 acceptance limits — charged for re-work.

Visual inspection (CWI)

  • Fit-upAcceptHector SalasMay 6, 2026, 6:00 AM

    API 1104 · Bevel, alignment and hi-lo verified prior to root.

  • Final visualAcceptHector SalasMay 6, 2026, 12:12 PM

    API 1104

Coating inspection

  • RepairRenee Alcorta5/6/2026
    DFT
    22.2 mils
    Holidays
    0
    Surface temp
    89°F
    Humidity
    29%

    SSPC-SP 10 near-white blast · FBE + ARO overlay