WeldGuard verified
RC-307

Travis Nolan

Redrock Pipeline Services

ID verified

Identity confirmed 2026-05-04 · REAL ID driver license (in-person scan) · Contractor onboarding — Bridgeline Field Office

Certification
API 1104 / 6G Downhill
Valid through
2026-09-18
Current job tenure
2026-05-04 present
Status
Active

2,548

Career joints

4,112

Career passes

1.8%

Repair rate

Job history · 4 jobs

  • Gulf Coast Loop 32024

    Tidewater Pipeline · 24" · 491 joints · 2.0% repair · Completed

  • Cushing Interconnect2023

    Redbud Terminals · 30" · 673 joints · 1.2% repair · Completed

  • Bakken Crude Lateral2023

    Northlight Energy · 20" · 400 joints · 1.3% repair · Completed

  • Redrock Pipeline Services — current job2026

    In progress

Qualified to weld (WPS)

  • WPS-1104-DH-01 Rev 2SMAW downhill5G / 6Gqualified 2024-11-12

    Mainline girth welds — downhill SMAW · Buried mainline

    E6010E8010-G
    Pipe size
    6–36 in OD
    Wall thickness
    0.188–0.75 in
    Material
    API 5L X65
    Hardness
    248 HV10 max

Continuity log

6-month rule
  • SMAW downhill5G / 6GCurrent

    Last performed 2026-06-17 on joint J-4380 · 135 days left (expires 2026-12-17)

Career figures roll up every WeldGuard job this welder has worked — weld passes attributed to them in the field and the independent NDT results recorded against those joints.

weldguard.app/w/travis-nolan-rc307

Back to overview