WeldGuard verified
RC-501

Ray Delgado

Redstone Mechanical

ID verified

Identity confirmed 2026-05-04 · REAL ID driver license (in-person scan) · Contractor onboarding — Bridgeline Field Office

Certification
API 1104 / 6G All-Pass Tie-In
Valid through
2027-09-15
Current job tenure
2026-05-04 present
Status
Active

2,395

Career joints

5,619

Career passes

2.2%

Repair rate

Job history · 4 jobs

  • Cushing Interconnect2023

    Redbud Terminals · 30" · 782 joints · 0.6% repair · Completed

  • Bakken Crude Lateral2023

    Northlight Energy · 20" · 509 joints · 4.9% repair · Removed — repeat repairs

  • Marcellus Feeder B2021

    Allegheny Gas Partners · 12" · 691 joints · 2.2% repair · Completed

  • Redstone Mechanical — current job2026

    In progress

Qualified to weld (WPS)

  • WPS-1104-TI-11 Rev 1SMAW uphill6G (fixed)qualified 2025-02-05

    Tie-in and golden welds — uphill SMAW · Buried mainline (tie-in)

    E6010E7018-H4
    Pipe size
    4–36 in OD
    Wall thickness
    0.188–0.75 in
    Material
    API 5L X65
    Hardness
    235 HV10 max

Continuity log

6-month rule
  • SMAW uphill6G (fixed)Current

    Last performed 2026-06-17 on joint J-4379 · 135 days left (expires 2026-12-17)

Career figures roll up every WeldGuard job this welder has worked — weld passes attributed to them in the field and the independent NDT results recorded against those joints.

weldguard.app/w/ray-delgado-rc501

Back to overview