WeldGuard verified
RC-173

Marvin Doucet

Redstone Mechanical

ID pending

REAL ID (LA DL) Work history below is not yet bound to a verified identity.

Certification
API 1104 / 6G Downhill
Valid through
2027-02-27
Current job tenure
2026-05-04 present
Status
Active

1,425

Career joints

3,700

Career passes

5.5%

Repair rate

Job history · 2 jobs

  • Red River Extension2025

    Northline Gas · 12" · 742 joints · 9.7% repair · Completed

  • Redstone Mechanical — current job2026

    In progress

Qualified to weld (WPS)

  • WPS-1104-DH-01 Rev 2SMAW downhill5G / 6Gqualified 2025-05-15

    Mainline girth welds — downhill SMAW · Buried mainline

    E6010E8010-G
    Pipe size
    6–36 in OD
    Wall thickness
    0.188–0.75 in
    Material
    API 5L X65
    Hardness
    248 HV10 max

Continuity log

6-month rule
  • SMAW downhill6GCurrent

    Last performed 2026-06-17 on joint Mainline production · 135 days left (expires 2026-12-17)

Career figures roll up every WeldGuard job this welder has worked — weld passes attributed to them in the field and the independent NDT results recorded against those joints.

weldguard.app/w/marvin-doucet-rc173

Back to overview