WeldGuard verified
RC-118

Marcus Cole

Redrock Pipeline Services

ID verified

Identity confirmed 2026-05-04 · REAL ID driver license (in-person scan) · Contractor onboarding — Bridgeline Field Office

Certification
API 1104 / 6G Downhill
Valid through
2027-02-11
Current job tenure
2026-05-04 present
Status
Active

3,078

Career joints

4,981

Career passes

1.8%

Repair rate

Job history · 4 jobs

  • Gulf Coast Loop 32024

    Tidewater Pipeline · 24" · 463 joints · 0.6% repair · Completed

  • Permian Gathering Expansion2022

    Kestrel Midstream · 16" · 801 joints · 1.4% repair · Completed

  • Marcellus Feeder B2021

    Allegheny Gas Partners · 12" · 554 joints · 1.3% repair · Completed

  • Redrock Pipeline Services — current job2026

    In progress

Qualified to weld (WPS)

  • WPS-1104-AG-07 Rev 1SMAW uphill6G (fixed)qualified 2025-05-02

    Above-ground station piping — uphill SMAW · Above-ground fabrication

    E6010E7018
    Pipe size
    2–12 in OD
    Wall thickness
    0.154–0.5 in
    Material
    ASTM A106 Gr. B
    Hardness
    235 HV10 max
  • WPS-1104-DH-01 Rev 2SMAW downhill5G / 6Gqualified 2025-03-14

    Mainline girth welds — downhill SMAW · Buried mainline

    E6010E8010-G
    Pipe size
    6–36 in OD
    Wall thickness
    0.188–0.75 in
    Material
    API 5L X65
    Hardness
    248 HV10 max

Continuity log

6-month rule
  • SMAW downhill6G (fixed)Current

    Last performed 2026-06-17 on joint J-4371 · 135 days left (expires 2026-12-17)

Career figures roll up every WeldGuard job this welder has worked — weld passes attributed to them in the field and the independent NDT results recorded against those joints.

weldguard.app/w/marcus-cole-rc118

Back to overview