WeldGuard verified
RC-231

Luis Ontiveros

Redrock Pipeline Services

ID verified

Identity confirmed 2026-05-04 · REAL ID driver license (in-person scan) · Contractor onboarding — Bridgeline Field Office

Certification
API 1104 / 6G Uphill
Valid through
2027-06-01
Current job tenure
2026-05-04 2026-05-16
Status
Off the job

3,267

Career joints

5,376

Career passes

1.8%

Repair rate

Job history · 4 jobs

  • Gulf Coast Loop 32024

    Tidewater Pipeline · 24" · 846 joints · 1.9% repair · Completed

  • Cushing Interconnect2023

    Redbud Terminals · 30" · 508 joints · 1.2% repair · Completed

  • Bakken Crude Lateral2023

    Northlight Energy · 20" · 755 joints · 1.2% repair · Completed

  • Redrock Pipeline Services — current job2026

    Off the job

Qualified to weld (WPS)

  • WPS-1104-TI-11 Rev 1SMAW uphill6G (fixed)qualified 2025-01-30

    Tie-in and golden welds — uphill SMAW · Buried mainline (tie-in)

    E6010E7018-H4
    Pipe size
    4–36 in OD
    Wall thickness
    0.188–0.75 in
    Material
    API 5L X65
    Hardness
    235 HV10 max

Continuity log

6-month rule
  • SMAW uphill6G (fixed)Current

    Last performed 2026-05-16 on joint J-1249 · 104 days left (expires 2026-11-16)

Career figures roll up every WeldGuard job this welder has worked — weld passes attributed to them in the field and the independent NDT results recorded against those joints.

weldguard.app/w/luis-ontiveros-rc231

Back to overview