WeldGuard verified
RC-165

Cody Latham

Redrock Pipeline Services

ID verified

Identity confirmed 2026-05-04 · REAL ID (AR DL) · J. Pruitt

Certification
API 1104 / 6G Downhill
Valid through
2027-05-12
Current job tenure
2026-05-04 present
Status
Active

1,293

Career joints

3,140

Career passes

5.0%

Repair rate

Job history · 2 jobs

  • Sabine Lateral Phase 22025

    Gulfstream Midstream · 20" · 598 joints · 8.0% repair · Completed

  • Redrock Pipeline Services — current job2026

    In progress

Qualified to weld (WPS)

  • WPS-1104-DH-01 Rev 2SMAW downhill5G / 6Gqualified 2025-07-24

    Mainline girth welds — downhill SMAW · Buried mainline

    E6010E8010-G
    Pipe size
    6–36 in OD
    Wall thickness
    0.188–0.75 in
    Material
    API 5L X65
    Hardness
    248 HV10 max

Continuity log

6-month rule
  • SMAW downhill6GCurrent

    Last performed 2026-06-17 on joint Mainline production · 135 days left (expires 2026-12-17)

Career figures roll up every WeldGuard job this welder has worked — weld passes attributed to them in the field and the independent NDT results recorded against those joints.

weldguard.app/w/cody-latham-rc165